Tezos (XTZ) funding maintenance in preparation for protocol upgrade
Scheduled Maintenance Report for Kraken
Completed
The scheduled maintenance has been completed.
Posted Oct 20, 2019 - 00:08 UTC
Verifying
We are currently verifying the Tezos (XTZ) protocol upgrade. Deposits and withdrawals are being processed normally, but withdrawals to KT1 addresses are currently unavailable until further notice.
Posted Oct 18, 2019 - 11:20 UTC
Update
The planned Tezos (XTZ) protocol upgrade is still in progress. We are monitoring the network status and Tezos (XTZ) funding will be available when the planned protocol upgrade has been completed. We expect the downtime to last an additional 30 minutes.
Posted Oct 18, 2019 - 10:10 UTC
Update
The planned Tezos (XTZ) protocol upgrade has not yet been completed. We are monitoring the network status and Tezos (XTZ) funding will be available when the planned protocol upgrade has been completed. We expect the downtime to last an additional 60 minutes.
Posted Oct 18, 2019 - 09:04 UTC
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Oct 18, 2019 - 08:00 UTC
Scheduled
Tezos (XTZ) funding will be down for maintenance at 08:00 UTC October 18th. The maintenance is in preparation for a planned Tezos protocol upgrade. The downtime is expected to last 60 minutes. We will provide updates as necessary.

For more information on the planned protocol upgrade, see the following: https://tezos.gitlab.io/master/protocols/005_babylon.html
Posted Oct 17, 2019 - 16:00 UTC
This scheduled maintenance affected: Digital Currency Funding (Tezos (XTZ)).