In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 13, 2026 - 14:00 UTC
Scheduled - Nillion ($NIL) is migrating from Cosmos to Ethereum.
Kraken will handle this migration automatically on your behalf, no action is required from you.
Here's what you need to know:
Ticker: NIL (unchanged). Conversion rate: 1:1 — your balance will not change. NIL on Cosmos will no longer be supported on Kraken after the migration.
Key dates:
March 13, 2026 at 2:00 PM UTC: Deposits and withdrawals for NIL on Cosmos will be paused. March 16 to 20, 2026 at 2:00 PM UTC: Migration will be performed for all clients. Funding will resume for NIL on Ethereum once complete.
There is no change to your ledger balances. Once the migration is finalized, your NIL will appear in your account as an Ethereum-based token, and deposits and withdrawals will reopen.
We will provide updates as necessary.
Mar 13, 202614:00 - Mar 19, 202614:00 UTC
Update - We would like to inform you that the ongoing platform maintenance has been extended to tomorrow (Friday 13th March), with an upgrade window of 09:00 to 21:00 UTC. During this period, you may occasionally experience temporary disruption, particularly on trading APIs.
Mar 12, 2026 - 20:10 UTC
Update - Scheduled maintenance is still in progress. We will provide updates as necessary.
Mar 10, 2026 - 14:20 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 10, 2026 - 14:00 UTC
Scheduled - Our Platform will be undergoing scheduled maintenance this week (Tuesday through Thursday). During the upgrade windows — 08:00 to 20:00 UTC on each of those days — in some very rare cases you may occasionally see temporary impact, particularly on trading APIs, though other services may also be affected.
Mar 10, 202614:00 - Mar 12, 202602:00 UTC
This is the status page for Kraken Digital Asset Exchange (www.kraken.com). If an issue is indicated here, you can be assured that we are working to resolve it as soon as possible and return to normal operations.
The Stellar (XLM) funding gateway will be undergoing maintenance from 21:30 UTC on March 16th for approximately 4 hours. Deposits and withdrawals will be unavailable - transfers made during this time will be processed shortly after the maintenance is complete. We will provide updates as necessary. Posted on
Mar 13, 2026 - 02:20 UTC
XNAP Delisting
May 29, 202623:00 - May 30, 202600:00 UTC
As part of our regular asset reviews, Kraken will begin a scheduled delisting cycle for XNAP.
Key dates: February 6th: Deposits will be disabled at 14:00 UTC. February 19th: Markets will be disabled at 14:00 UTC. May 20th: Withdrawals will be disabled at 14:00 UTC. May 21 - May 29: Remaining platform balances will be liquidated. We recommend reviewing your portfolio and taking any necessary actions before then.
Please note that the legacy XNAP token that Kraken is delisting currently has an extremely inactive market. As a result, liquidation prices may be significantly below recent reference prices and, in some cases, may result in minimal or no proceeds due to insufficient market liquidity at the time of execution. Posted on
Feb 05, 2026 - 13:56 UTC
As part of our regular asset reviews, Kraken will begin a scheduled delisting cycle in the EEA for the following assets: U2U and ESX
Key dates: February 27 at 14:00 UTC: Deposits and Markets will be disabled for EEA May 28 at 14:00 UTC: Withdrawals will be disabled for EEA May 29 to June 5: Remaining balances for EEA clients will be liquidated
Withdrawals will remain available until May 28th at 13:59 UTC. We recommend reviewing your portfolio and taking any necessary actions before then.
Please note that liquidation prices may be significantly below recent market prices due to liquidity and market conditions at the time of execution and may, in some cases, result in minimal or no proceeds if sufficient liquidity is not available. Posted on
Feb 17, 2026 - 16:00 UTC
STEP has announced that it will be shutting down. As a result, Kraken will be delisting STEP and disabling related services in phases.
Because the underlying chain may shut down without notice, we strongly recommend taking action as soon as possible. If the chain stops before the dates below, remaining balances may be permanently lost.
Key dates: • March 20, 2026, 14:00 UTC: Deposits and trading for STEP will be disabled. • June 18, 2026, 14:00 UTC: Withdrawals will be disabled for clients in the EEA. • June 19, June 29, 2026: Any remaining balances will be liquidated.
Important notes:
• The STEP network may shut down before these dates. If this happens, withdrawals may no longer be possible and remaining balances could be lost. • We recommend following STEP’s official social channels for updates regarding the project shutdown. • If liquidation occurs, execution prices may be significantly worse than current market prices due to liquidity and market conditions. This could result in minimal or no proceeds.
To avoid disruption, please review your account and withdraw or convert any STEP balances ahead of the deadlines above. Posted on
Mar 10, 2026 - 09:09 UTC
Resolved -
This incident has been resolved.
Mar 13, 17:04 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 13, 17:04 UTC
Identified -
The issue has been identified and a fix is being implemented.
Mar 13, 16:31 UTC
Investigating -
We are currently investigating this issue.
Mar 13, 15:45 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 13, 15:35 UTC
Update -
We are continuing to investigate this issue.
Mar 13, 11:30 UTC
Investigating -
We are investigating reports from clients facing error preventing them from approving new devices. Problem occurs on both Mobile and Web platforms and affects small subset of clients.
Mar 13, 11:29 UTC
Resolved -
This incident has been resolved.
Mar 13, 08:25 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 13, 08:17 UTC
Identified -
The issue has been identified and a fix is being implemented.
Mar 13, 04:43 UTC
Investigating -
We're investigating an issue with the Bittensor (TAO) funding gateway. Withdrawals may be delayed at this time. All other funding methods are operating normally. We are working diligently to resolve the issue and will keep you updated.
Mar 13, 00:13 UTC
Resolved -
This incident has been resolved.
Mar 11, 22:55 UTC
Monitoring -
We are still working on processing the backlog.
New deposits are being deposited as expected.
Mar 11, 22:05 UTC
Identified -
The issue has been identified and a fix is being implemented.
Mar 11, 20:55 UTC
Investigating -
We're investigating an issue with the Ethereum ERC20 funding gateway. Deposits and withdrawals may be delayed at this time. All other funding methods are operating normally. We are working diligently to resolve the issue and will keep you updated.
Mar 11, 20:47 UTC
Resolved -
This incident has been resolved.
Mar 11, 20:13 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 11, 19:51 UTC
Update -
Some clients may also be experiencing issues where the email approval link redirects to a logged out state on Kraken.com.
This is currently only impacting logins from new devices that have not previously been approved.
Mar 11, 19:39 UTC
Identified -
We are aware of an issue where some clients are not receiving device approval emails, which may prevent sign-in on unrecognized devices.
We are actively investigating and working on a resolution. Clients who have already approved their device or use alternative 2FA methods should not be affected.
We will provide updates as we have more information.
Mar 11, 19:28 UTC
Resolved -
This incident has been resolved.
Mar 11, 00:47 UTC
Investigating -
We're investigating an issue with the Bittensor (TAO) funding gateway. Deposits may be delayed at this time. All other funding methods are operating normally. We are working diligently to resolve the issue and will keep you updated.
Mar 10, 23:56 UTC
Resolved -
This incident has been resolved.
Mar 10, 10:38 UTC
Identified -
The issue has been identified and a fix is being implemented.
Mar 10, 10:25 UTC
Investigating -
We're investigating an issue with the Cronos (CRO) funding gateway. Deposits and withdrawals may be delayed at this time. All other funding methods are operating normally. We are working diligently to resolve the issue and will keep you updated.
Mar 10, 09:43 UTC
Resolved -
This incident has been resolved.
Mar 10, 01:05 UTC
Identified -
We are aware of an ongoing issue with our third-party provider, Plaid, that is causing delays for US clients initiating deposits or withdrawals via Plaid linked bank accounts.
We are monitoring the situation and will provide updates as more information becomes available.
Mar 9, 22:30 UTC
Completed -
The scheduled maintenance has been completed.
Mar 10, 00:00 UTC
Scheduled -
We are currently delisting the following assets: UST, LUNA2, NODL, PDA, ETHW, TVK, TUSD, MOVE, and BRICK. Markets and deposits for these assets were disabled on December 12, 2025. Withdrawals will remain available until February 28, 2026 at 2:00 PM UTC. Any remaining balances on the platform will be liquidated during the liquidation period, which will run from March 1, 2026 through March 9, 2026.
Please note that several of these assets currently have extremely limited or inactive markets. As a result, liquidation prices may be significantly below recent reference prices and, in some cases, may result in minimal or no proceeds due to insufficient market liquidity at the time of execution.
Completed -
The scheduled maintenance has been completed.
Mar 9, 23:26 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 9, 22:00 UTC
Scheduled -
We will be performing scheduled maintenance on USD deposits and withdrawals via Dart Bank.
During this window: - In-progress ACH deposits and withdrawals may experience slight delays. - New ACH USD deposits will be temporarily unavailable. - All wire transfers (inbound and outbound) will be unavailable. - Deposit instruction requests will be temporarily unavailable.
Plaid ACH remains available as an alternative for deposits during this time.
We appreciate your patience and will provide an update once maintenance is complete.
Mar 6, 22:36 UTC
Resolved -
This incident has been resolved.
Mar 9, 14:07 UTC
Investigating -
We're investigating an issue with the Aptos (APT) funding gateway. Withdrawals may be delayed at this time. All other funding methods are operating normally. We are working diligently to resolve the issue and will keep you updated.
Mar 9, 10:28 UTC
Resolved -
This incident has been resolved.
Mar 9, 08:32 UTC
Investigating -
We are investigating an issue with Spot Exchange clients connecting to the platform and submitting orders over all Web & Mobile applications and Rest and Websocket connections. We are expecting to resolve the issue within a few minutes.
Mar 9, 08:25 UTC
Completed -
The platform is back online and post-only has been removed.
Mar 9, 08:23 UTC
Verifying -
The platform is in post-only mode while checks are being performed. Orders can be placed or cancelled, but no executions or liquidations can occur until post-only is removed.
Mar 9, 08:19 UTC
Update -
Scheduled maintenance is still in progress. We will provide updates as necessary.
Mar 9, 08:12 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 9, 08:00 UTC
Scheduled -
The Derivatives platform will be unavailable for approximately 10 minutes on Monday (March 9th) at 08:00 UTC as we perform site maintenance. There will be a period of 'post-only' once the platform is back online and checks are being completed.
Mar 6, 17:02 UTC
Completed -
The scheduled maintenance has been completed.
Mar 9, 08:18 UTC
Update -
Markets are back online while we continue to verify the system status. All order types may be submitted and can be matched.
Mar 9, 08:10 UTC
Verifying -
Markets are now in post-only mode. Only new limit, post-only orders can be submitted. Other order types will be rejected. Existing orders can still be cancelled.
Mar 9, 08:08 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 9, 08:01 UTC
Scheduled -
The Kraken Spot Exchange Website and API will be undergoing maintenance as we upgrade our systems on Monday, March 9 at 07:45 UTC, and be unavailable for approximately 45 minutes. Please note that this is a rough estimate and the precise time when services return may change slightly. It is recommended not to place or cancel orders during this timeframe. Deposits and withdrawals initiated during the maintenance may be delayed. Sign-in and other non-trading related features will be operational. We kindly advise all our clients to plan ahead accordingly and make necessary account adjustments prior to the start of the maintenance. Following maintenance, markets will briefly enter cancel-only mode, and then post-only mode, before returning to full functionality.
Mar 6, 10:03 UTC
Resolved -
This incident has been resolved.
Mar 9, 02:49 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 9, 02:26 UTC
Investigating -
We’re currently investigating an issue where some users may be unable to allocate or deallocate assets on Kraken Earn. We’ll share another update as soon as more information becomes available.
Mar 9, 02:18 UTC
Completed -
The scheduled maintenance has been completed.
Mar 8, 12:18 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 8, 06:00 UTC
Scheduled -
Our funding provider, PayPer, will be conducting scheduled maintenance on Sunday, March 8 2026 at 06:00 UTC for approximately 5 hours. During this time deposits and withdrawals via Interac E-transfer will be temporarily unavailable.
We will provide updates as they become available.
Mar 6, 21:37 UTC
Resolved -
This incident has been resolved.
Mar 8, 07:30 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 8, 06:11 UTC
Investigating -
We are investigating reports from clients having issues with the Spot WebSocket API. We are working to resolve the issue and will update as soon as we have more information.
Mar 8, 05:59 UTC
Resolved -
This incident has been resolved.
Mar 8, 07:14 UTC
Update -
We are continuing to monitor for any further issues.
Mar 8, 06:23 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 8, 06:11 UTC
Investigating -
We are currently investigating an issue affecting portfolio display. Our engineering team has been engaged and is actively investigating the cause. We will provide further updates as more information becomes available.
Mar 8, 05:36 UTC
Completed -
The scheduled maintenance has been completed.
Mar 7, 14:00 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 7, 10:00 UTC
Scheduled -
Our funding provider, Banking Circle, will be conducting scheduled maintenance on Saturday, March 7 2026 at 10:00 UTC for approximately four hours. During this time, EUR deposits via SEPA and SEPA Instant, GBP deposits via FPS, EUR and GBP deposits via Plaid, and sign-up requests to obtain deposit details using Banking Circle will be temporarily impacted.
Deposits and withdrawals in EUR and GBP may be delayed during this time, and transfers made during this window will be processed shortly after the maintenance is complete. Virtual account creation requests will also be delayed. We will provide updates as they become available.
Feb 23, 09:59 UTC
Completed -
The scheduled maintenance has been completed.
Mar 6, 20:02 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 6, 17:00 UTC
Scheduled -
The Litecoin (LTC) funding gateway will be undergoing maintenance from 17:00 UTC today for approximately 3 hours. Deposits will remain available during this time. Withdrawals will continue to be processed but may take longer than usual. We will provide updates as necessary.
Mar 6, 15:28 UTC
Resolved -
This incident has been resolved.
Mar 6, 19:50 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 6, 19:23 UTC
Identified -
The issue has been identified and a fix is being implemented.
Mar 6, 19:19 UTC
Investigating -
We are investigating reports from clients who are unable to complete deposits via Plaid. The deposit confirmation button may appear greyed out and unclickable.
We are actively investigating the cause. Deposits via other funding methods are unaffected.
We will provide updates as we learn more.
Mar 6, 18:38 UTC
Resolved -
This incident has been resolved.
Mar 6, 14:52 UTC
Investigating -
We are currently investigating an issue related to recurring/custom orders related to Avalanche [AAVE] which may cause previously set up orders not to trigger properly. Updates will be posted here.
Mar 6, 12:46 UTC
Resolved -
This incident has been resolved.
Mar 6, 13:31 UTC
Monitoring -
A fix has been implemented and all the new transactions should be processed without an issue. We are currently working on resolving backlog of outstanding transactions. Only Polygon (POL) deposits/withdrawals are still affected.
Mar 6, 12:55 UTC
Investigating -
We're investigating an issue with the Polygon funding gateway. Deposits and withdrawals may be delayed for the assets on the Polygon Network. All other funding methods are operating normally. We are working diligently to resolve the issue and will keep you updated.
Mar 6, 09:14 UTC
Resolved -
This incident has been resolved.
Mar 6, 02:53 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 6, 00:25 UTC
Identified -
The issue has been identified and a fix is being implemented.
Mar 5, 23:47 UTC
Investigating -
We're investigating an issue with the Ethereum ERC20 funding gateway. Deposits and withdrawals may be delayed at this time. All other funding methods are operating normally. We are working diligently to resolve the issue and will keep you updated.
Mar 5, 23:07 UTC
Completed -
The platform is back online and post-only has been removed.
Mar 5, 08:12 UTC
Verifying -
The platform is in post-only mode while checks are being performed. Orders can be placed or cancelled, but no executions or liquidations can occur until post-only is removed.
Mar 5, 08:09 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 5, 08:00 UTC
Scheduled -
The Derivatives platform will be unavailable for approximately 10 minutes on Thursday (March 5th) at 08:00 UTC as we perform site maintenance. There will be a period of 'post-only' once the platform is back online and checks are being completed.
Mar 4, 14:20 UTC
Completed -
The scheduled maintenance has been completed.
Mar 5, 03:26 UTC
Update -
Scheduled maintenance is still in progress. We will provide updates as necessary.
Mar 5, 03:26 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 5, 01:30 UTC
Scheduled -
The Stacks (STX) funding gateway will be undergoing maintenance from 1:30 UTC March 5th, 2026 for approximately 3 hours. Deposits and withdrawals will be unavailable - transfers made during this time will be processed shortly after the maintenance is complete. We will provide updates as necessary.
Mar 4, 02:28 UTC
Completed -
The scheduled maintenance has been postponed.
Mar 4, 14:22 UTC
Scheduled -
The Kraken Spot Exchange Website and API will be undergoing maintenance as we upgrade our systems on Thursday, March 5 at 08:00 UTC, and be unavailable for approximately 15 minutes. Please note that this is a rough estimate and the precise time when services return may change slightly. It is recommended not to place or cancel orders during this timeframe. Deposits and withdrawals initiated during the maintenance may be delayed. Sign-in and other non-trading related features will be operational. We kindly advise all our clients to plan ahead accordingly and make necessary account adjustments prior to the start of the maintenance. Following maintenance, markets will briefly enter cancel-only mode, and then post-only mode, before returning to full functionality.
Mar 3, 12:28 UTC
Resolved -
This incident has been resolved.
Mar 4, 11:07 UTC
Update -
Portfolio PnL issue is fixed now. Limited subset of clients may still experience delays with issuing report statements. We will provide further updates as soon as more information becomes available.
Mar 3, 13:41 UTC
Identified -
The issue has been identified and a fix is being implemented.
Mar 3, 08:33 UTC
Investigating -
We are investigating an issue impacting a limited subset of clients who are currently unable to issue report statements. Additionally, a small subset of clients who recently changed their portfolio currency may not see their updated Portfolio PnL. We will provide further updates as soon as more information becomes available.
Mar 3, 07:56 UTC
Completed -
The scheduled maintenance has been completed.
Mar 4, 03:38 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 4, 01:19 UTC
Scheduled -
The Kaspa (KAS) funding gateway will be undergoing maintenance from 1:20 UTC today for approximately 3 hours and 30 minutes. Deposits and withdrawals will be unavailable - transfers made during this time will be processed shortly after the maintenance is complete. We will provide updates as necessary.
Mar 4, 00:03 UTC
Completed -
The scheduled maintenance has been completed.
Mar 4, 02:26 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 4, 01:30 UTC
Scheduled -
The Stacks (STX) funding gateway will be undergoing maintenance from 1:30 UTC March 4th, 2026 for approximately 3 hours. Deposits and withdrawals will be unavailable - transfers made during this time will be processed shortly after the maintenance is complete. We will provide updates as necessary.
Mar 3, 23:52 UTC
Completed -
The scheduled maintenance has been completed.
Mar 4, 02:00 UTC
Scheduled -
MANTRA ($OM) will be migrating and rebranding to MANTRA ($MANTRA) on March 2nd. OM will be converted to MANTRA at a rate of 1:4. This will be performed automatically on Kraken. All OM balances will be converted to MANTRA (1:4 rate). OM pairs will be delisted and replaced with MANTRA pairs once the migration is completed.
Dates: - February 24th, 2pm UTC: OM margin pair(s) set to reduce-only - February 25th, 2pm UTC: Funding paused and margin positions are closed and delisted - February 26th, 2pm UTC: Spot markets are put into cancel-only - February 27th, 2pm UTC: All open spot orders are cancelled - March 2nd, 2pm UTC: Spot market is delisted - March 3rd (by 11:59pm UTC): MANTRA deposits & withdrawals opened and spot markets put into post-only - March 4th, 2pm UTC: MANTRA spot and margin go-live
Feb 17, 15:50 UTC
Resolved -
This incident has been resolved.
Mar 2, 16:13 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 2, 15:31 UTC
Investigating -
We're investigating an issue with the Bitcoin (BTC) - Lightning Network funding gateway. Deposits and withdrawals may be delayed at this time. All other funding methods are operating normally. We are working diligently to resolve the issue and will keep you updated.
Mar 2, 14:12 UTC
Resolved -
This incident has been resolved.
Mar 2, 06:01 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 2, 05:56 UTC
Identified -
The issue has been identified and a fix is being implemented.
Mar 2, 05:01 UTC
Investigating -
We are currently investigating an issue impacting the visibility of the Portfolio page on Kraken.com. Our team is actively working to resolve it, and we will share additional updates as they become available.
Mar 2, 04:57 UTC
Completed -
The scheduled maintenance has been completed.
Mar 2, 04:05 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Mar 2, 02:00 UTC
Scheduled -
The Stacks (STX) funding gateway will be undergoing maintenance from 2:00 UTC on Monday, March 2nd for approximately one hour. Deposits and withdrawals will be unavailable. Transfers made during this time will be processed shortly after the maintenance is complete. We will provide updates as necessary.
Feb 25, 02:18 UTC
Resolved -
This incident has been resolved.
Mar 1, 16:28 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Mar 1, 16:06 UTC
Identified -
The issue has been identified and a fix is being implemented.
Mar 1, 15:32 UTC
Investigating -
We are investigating reports from clients having difficulty connecting to API, WEB and Mobile Apps. We are working to resolve the issue and will update as soon as we have more information.
Mar 1, 15:19 UTC
Completed -
The scheduled maintenance has been completed.
Mar 1, 15:16 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Feb 27, 18:00 UTC
Scheduled -
We will be conducting scheduled maintenance to our Banking Circle Australia (AUD) funding infrastructure beginning February 27 at 18:00 UTC, with an expected duration of approximately 43 hours. This maintenance supports a planned update to our underlying AUD banking setup.
During this period, outbound AUD payments processed via Banking Circle AU will be temporarily unavailable. Incoming AUD payments will continue to be received but may not appear in account balances until the maintenance window has concluded. Access to related AUD account details and reporting may also be intermittently unavailable. All other currencies and funding providers are unaffected.
We will provide updates if any changes to the timeline.
Feb 27, 17:29 UTC
Resolved -
This incident has been resolved.
Feb 27, 19:09 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Feb 27, 19:00 UTC
Identified -
The issue has been identified and a fix is being implemented.
Feb 27, 13:42 UTC
Investigating -
We're investigating an issue with the Solana (SOL) funding gateway. Deposits and withdrawals on SOL and SPL tokens may be delayed at this time. All other funding methods are operating normally. We are working diligently to resolve the issue and will keep you updated.
Feb 27, 12:14 UTC
Resolved -
This incident has been resolved.
Feb 27, 15:12 UTC
Monitoring -
A fix has been implemented and we are monitoring the results.
Feb 25, 21:38 UTC
Identified -
The issue has been identified and a fix is being implemented.
Feb 25, 20:10 UTC
Investigating -
We are investigating an issue that prevents subset of clients from performing card actions like ordering, freezing, unfreezing, viewing limits etc. Transactions are not affected. Updates will be posted here.
Feb 25, 15:56 UTC